Your cart is empty.
Your cart is empty.4.5 out of 5 stars
jennifer derosa
Reviewed in the United States on March 6, 2025
Fantastic ! Perfect long leash... Well made
C. Engel
Reviewed in the United States on March 3, 2025
We moved to a house that did not have a fenced in backyard, this leash is great for still letting them have their freedom, but safer and stronger than any retractable leash.
Catherine Thibodeau
Reviewed in Canada on February 23, 2025
Parfait pour le dressage de notre chien en forêt
Keri
Reviewed in the United States on January 4, 2025
Easy to clean, and resists dirt, mud, water, snow. Being as long as it is, it's a little bit to handle, but it really doesn't tangle a whole lot, and if it does, it's easy to get untangled. The clasp is decent, I like that it's flat without a button sticking out to get caught on brush, etc. if we're in the woods. Holding up well with the training (and playing) we've been doing. It's pretty strong, we did have one instance where I had to step on it when the dog started to dart away, and it held. I don't know if I'd do that frequently, but when needed, it worked.
Jean-Marc PITTET
Reviewed in France on January 17, 2025
Cette longe est faite dans un matériau super, facile à dérouler et réenrouler. Elle est légère et très solide.
KD
Reviewed in the United States on September 19, 2024
Lightweight and lengthy , great for letting little dogs have some freedom wo a leash , to play or for training on recall.. wipes down easily. Doesnt get wet n soggy from grass.Will get dusty in dirt but cleans easily with a rag.
Blair
Reviewed in the United States on September 16, 2024
I ordered the 15 ft least last minute before a beach trip and I’m so glad I did! It was great to give my Boston terrier extra space to explore the beach while keeping him on leash. Lightweight, not slippery, great in the water and sand. Very happy w purchase.
NSmith
Reviewed in the United States on August 14, 2024
I actually had to borrow this check cord at a hunting training because the one I had was leaving rope burns on my hands. I was so impressed with this checkcord I immediately came home and ordered one.PROS: Does not tangle easily on brush when working in the field. Easy to handle- I can slowly bring my dog in to avoid hitting the end of the lead (I have a springer so he's a flusher vs pointer). Easy to clean.CONS: I really do not have any, but it is a bit bulkier when stashing in my hunting vest than my previous nylon one. Honestly- Not a con considering no rope on my hands.If you are looking for a good check cord to work your dog in the field, I HIGHLY recommend this one. Can't beat the Quality, function, and price.
Issabellen
Reviewed in Sweden on July 7, 2024
Got this based on many good reviews. Was not happy with the quality when taking it out of the box and started to make a return, then changed my mind and decided to give it a try anyways. Should have sent it back immediately, it started to break already on our first walk (medium size dog, 17kg who does not pull).
Nikkia Simmons
Reviewed in the United States on November 30, 2024
Used this for my bigger dog, who like to run while walking, so I put it on while at the park and he absolutely loved it. He was very happy that he was able to run freely yet still on a leash. I brought two of these and gone buy more for my family and their dogs. Absolutely worth purchasing, the size is good, ease to walking is good and not too much thickness and the functionality of the product is very good.
Katenally
Reviewed in the United States on November 10, 2024
Just what I expected when ordering. I bought the 30ft for training recall to our 3 month old retrieverI love the color it’s easy to keep track to avoid tripping over. I think this will hold up with puppy chewing too. Good quality
David
Reviewed in Canada on July 24, 2023
15 foot is perfect for what I needed. They don’t get tangled up and you can let your dogs free run with them on.
Ravania Reddy
Reviewed in the United Arab Emirates on February 13, 2022
This is my 4th purchase. Simply love these leads
Recommended Products