Shopping Cart

Your cart is empty.

Your cart is empty.

Dog Tie Out Stake and Run Cable, 20FT Long Lead with Yard Stake, Chains for Outside, Leash and Stake for Camping & Beach, Tie Out Tether for Medium Large Dogs

Free shipping on orders over $29.99

$19.99

$ 8 .99 $8.99

In Stock

1.:150lbs / 10ft


2.Color:Red


About this item

  • Heavy Duty Tie Out Stake: Our dog tie out cable and stake set is designed with more solid and durable, thickened stainless steel spiral stake and reinforced O-ring make this dog anchor no more easier broken and bending. Ergonomic handle of the dog ground stake gives more comfort while saving time and effort when insert and pull out.
  • 20FT Chain Dog Leash: Our 20 feet dog tie out leads for yard with 5.0mm diameter stainless steel vinyl-coated rope which is strength tested for dogs up to 150lbs. All the run cables have rigorously quality tested to withstand up to 5000+N pull force. Providing more space for free movement while ensuring safety.
  • High Quality Buckle: Heavy duty 360° swivel clip is designed with high grade steel which is rust-proof and wear-resistant, ultra-light but super strong for small to large dogs. Both ends of the dog chain leads have no tangle clips, which can reduce the tangle when dog is moving, aim to prevent dogs from being entangled.
  • Easy to Use: With the ergonomic handle and spiral stake design, you can screw the dog yard stake into the ground very easy, and then connect with the tie out cable, the quick release clips can ensure easy on & off connection, saving time and effort.
  • A Complete Set & Easy to Carry: Package include: 1 X 20 ft dog runner line, 1 X dog tie out stake, 1 X oxford storage bag for easy carrying out when camping outside. Our dog stake and tie out cable set is heavy duty enough for small to large dogs up to 150lbs dogs.



4.6 out of 5 stars Date First Available June 9, 2022 Item Package Dimensions L x W x H 17.64 x 6.38 x 2.09 inches Item Dimensions LxWxH 36 x 24 x 24 inches Brand Name Snagle Paw Target Audience Keyword dogs Size 150lbs / 20ft Breed Recommendation Small, Medium, Large Breeds

Product Description

1

HEAVY DUTY DOG TIE OUT STAKE AND CABLE SET

  • DURABLE & HEAVY: made of heavy steel,durable and solid enough for 125 lbs dog.
  • SAFE & FREEDOM: offer your pet the maximum freedom while keep safe.
  • 360° SWIVEL,NO TANGLE: let your dog freedom to roam without tangle.
  • RUST PROOF: anti rust design make the dog tie out stake suitable for all seasons.
  • MULTI OCCASIONS: back yard,pack,beach,camping,travel.

comfortable handle

Comfortable Handle

The dog tie out stake is made of an arc-angle handle, which is ergonomic and comfortable.

More convenient to screw into the ground.

thicker stainless steel

Spiral Design

The bottom of the stake adopts a mechanical spiral structure to drill the ground, which saves labor and has a strong grip effect.

thick O-ring

Thick O-ring

Upgraded thicker O-ring,No more easier broken,do not worry for your puppy safe,great for large dogs up to 125 lbs

playing in the park

playing when camping

playing in the yard

step 1

Step 1

Insert the tip of the tie out stake into the ground

step 2

Step 2

Use the handle to screw the stake into the ground

step 3

Step 3

Screw the tie out stake until the dome against the soil

step 4

Step 4

Clasp the cable to the ring,then let your dog roam around

dog tie out stake

WHY CHOOSE OUR DOG STAKE AND TIE OUT CABLE SET ?

  1. Thicker and stronger O-ring than the other models,360° tangle free,hold up to 125 lbs dogs.
  2. Sturdier and thicker stake,strong enough for medium to large dogs to play in the yard or the garden.
  3. Simple operating handles,more convenient and comfortable to screw into the ground.
Customer Reviews
4.6 out of 5 stars 1,632
4.6 out of 5 stars 1,632
4.6 out of 5 stars 89
4.6 out of 5 stars 89
4.6 out of 5 stars 89
4.6 out of 5 stars 89
Suitable for Dogs UP TO 125LBS UP TO 125LBS UP TO 220LBS UP TO 220LBS UP TO 220LBS UP TO 220LBS
Stake Size 17IN 17IN 17IN 17IN 17IN 17IN
Cable Size 20FT 20FT 20FT 20FT no data no data
Lockable no data no data

Customer
Reviewed in the United States on January 19, 2025
This is supposed to be for small dogs but the piece you hook to the dogs collar is too heavy. The dog is scared of it
Customer
Reviewed in the United States on January 19, 2025
This is supposed to be for small dogs but the piece you hook to the dogs collar is too heavy. The dog is scared of it
Carolyn Gerson
Reviewed in the United States on September 30, 2024
Got new fencing and had to figure out a way to keep my dog safe for a few days. So I ordered this, and it worked great
Carolyn Gerson
Reviewed in the United States on September 30, 2024
Got new fencing and had to figure out a way to keep my dog safe for a few days. So I ordered this, and it worked great
tlf
Reviewed in the United States on September 24, 2024
I bought this for a visit with a friend who doesn't have a fenced yard. It was easy to get into the ground, and the 20 ft length gave my small dog enough leeway to move around.
tlf
Reviewed in the United States on September 24, 2024
I bought this for a visit with a friend who doesn't have a fenced yard. It was easy to get into the ground, and the 20 ft length gave my small dog enough leeway to move around.
dean
Reviewed in the United States on February 29, 2024
A definite must have if you just got a puppy or you got a regular sized dog that needs to be taken out and left outside for long periods of time screw it in the ground it goes in the ground very easily everything that The seller side is true about it it's really good product try it
dean
Reviewed in the United States on February 29, 2024
A definite must have if you just got a puppy or you got a regular sized dog that needs to be taken out and left outside for long periods of time screw it in the ground it goes in the ground very easily everything that The seller side is true about it it's really good product try it
Placeholder
Reviewed in the United States on December 7, 2024
Get it ! Works well !
Placeholder
Reviewed in the United States on December 7, 2024
Get it ! Works well !
Nat
Reviewed in the United States on October 7, 2024
We have Australian shepherd that weighs about 60 pounds. She has not been able to pull it up from the ground.Very well made.
Nat
Reviewed in the United States on October 7, 2024
We have Australian shepherd that weighs about 60 pounds. She has not been able to pull it up from the ground.Very well made.
JK
Reviewed in the United States on March 9, 2023
The tie out is solid. It holds our two 60 pound hiskies with no issues; until, this past week when one of our dogs met me in the driveway with the tie out in tow. The cable ( purchased in November ), had snapped letting him loose. I'd hoped for a little more durability out of that and now have to purchase a new cable.
JK
Reviewed in the United States on March 9, 2023
The tie out is solid. It holds our two 60 pound hiskies with no issues; until, this past week when one of our dogs met me in the driveway with the tie out in tow. The cable ( purchased in November ), had snapped letting him loose. I'd hoped for a little more durability out of that and now have to purchase a new cable.
Heather Lofflin
Reviewed in the United States on October 5, 2022
There are a lot of choices out there, so I just sort of picked one based on the color and the price. I picked a good one. I've been using this to keep a 10-pound dog in the yard that has a brand new privacy fence -- she managed to find her way out three days after it was built. It will, however, catch on anything that gets in its way, but I imagine all other cables do the same thing. Easy to install and use. Good, sturdy quality. Would recommend.
Heather Lofflin
Reviewed in the United States on October 5, 2022
There are a lot of choices out there, so I just sort of picked one based on the color and the price. I picked a good one. I've been using this to keep a 10-pound dog in the yard that has a brand new privacy fence -- she managed to find her way out three days after it was built. It will, however, catch on anything that gets in its way, but I imagine all other cables do the same thing. Easy to install and use. Good, sturdy quality. Would recommend.
terra
Reviewed in Canada on June 7, 2021
Bought for my dog who gets a scent in her nose and roams. I am going up north and needed to keep my dog at hands reach. works great leash is not to long but long enough for me. thank you
terra
Reviewed in Canada on June 7, 2021
Bought for my dog who gets a scent in her nose and roams. I am going up north and needed to keep my dog at hands reach. works great leash is not to long but long enough for me. thank you
Maurice
Reviewed in Canada on June 30, 2021
Works good
Maurice
Reviewed in Canada on June 30, 2021
Works good
Manon L.
Reviewed in Canada on May 23, 2021
Parfait ! Solide et joli en plus
Manon L.
Reviewed in Canada on May 23, 2021
Parfait ! Solide et joli en plus
Richard Micallef
Reviewed in Canada on January 21, 2021
Great durable product.
Richard Micallef
Reviewed in Canada on January 21, 2021
Great durable product.
The Baker’s
Reviewed in Canada on January 18, 2021
We’ve had no issues with this. Very happy with it.
The Baker’s
Reviewed in Canada on January 18, 2021
We’ve had no issues with this. Very happy with it.
Recommended Products