Your cart is empty.
Your cart is empty.4.3 out of 5 stars
Christina F.
Reviewed in the United States on March 7, 2025
I bought this ten foot leash to walk my dog on the beach. It worked quite well. It’s not as thick as my normal leashes but works great for the occasional walk when the dog needs a longer lead.
charlene heath-lacava
Reviewed in the United States on February 23, 2025
What do you want me to Rite? It’s a leash it works.
Robert Cade Thompson
Reviewed in the United States on February 2, 2025
This leash is long, doesn't weigh much, and feels durable. We use it allow our dog more space while outside training. It makes walking around easier and functions well. Not much more I can say. It's a leash, and it works.
Aaron H.
Reviewed in the United States on February 17, 2025
Using this 20ft training leash with a smaller dog...I like that it's a strong and light weight nylon that seems well stitched and durable. I've used several types and brands over the years, and this is the right mix for a medium to small dog. I would go with a heavier (wider/thicker) nylon or leather leash for larger breeds. Enjoy...
Christine Busser
Reviewed in the United States on February 17, 2025
We used these at the beach for my 70 lb dogs. While it worked, the leash is very thin.
Kelly Dean
Reviewed in the United States on January 26, 2025
It's the biggest blessing and the biggest pain at the same time. My fence jumper can finally run around safely, but the leash does get tangled really easily.
Sylvia Meares
Reviewed in the United States on January 17, 2025
Love that there’s room for my dog to stretch out
Squeaky Frog
Reviewed in Canada on January 16, 2025
This leash is fabulous! I use this to run my dog in parks - it’s light, surprisingly waterproof, has good strong clips on both ends. Best of all, when my dog gets to the end of the lead or pulls, the leash I has stretch in it which helps take physical stress off the dog and me.
HonestReviews
Reviewed in Canada on September 1, 2024
4 out of 5 Stars (4.4)⭐⭐⭐⭐[TL;DR][QUALITY] (3/5)[VALUE] (4/5)[EASE OF USE] (5/5)[MET EXPECTATIONS] (5/5)[PACKAGING] (5/5)[REVIEW REMARKS]This is a great daily use leash. The handles are comfortable for the walker and the thickness of the weave in the rope, will last from fraying over a longer period of time.If your doggo is a leash chewer, the plastic seam covers will not last very long. This is the weakest part of the product. The seams should be covered with a thick chew resistant silicone or even a thick canvas. The plastic covers do come off and if you are not watching closely, it could become a choke risk.Aside from this minor issue, this leash is excellent on every other level.All in all, this is a great leash for a daily use leash. I do wish the plastic was a different material, as my doggo is a leash tugger and likes to chew the leash. The cover closest to the bottom of the leash came off after a very short chew session. We were able to snap it back on the leash, but it would be better if the cover was made of another material all together. Recommended, but only if your doggo is not a leash chewer of any degree. It is a great leash otherwise.In the event that experiences change or evolve, updates may be made to this review to address such developments.
Hoosier Forever
Reviewed in the United States on December 9, 2024
I had a broken ankle that kept me from taking my dog out for quite a long time. I purchased this so I could let her out the front door without my help. It has worked perfectly. It is definitely the length she needed to wander through the yard a bit. It is very nicely made, great quality.
Customer
Reviewed in Canada on December 4, 2024
This has been a welcome addition to our training regimen with our new rescue. It is strong and gives him enough space to run side to side on the leash until he is trained off of the leash. I am a little fearful that the rubber on the handle will not last as long as the cordage on the leash but overall it seems very durable. I really like the color as I am a big blue and green fan. I would buy again.
Mike Kuntz
Reviewed in Canada on November 8, 2024
I like the sponginess of the cord so if they pull it doesn’t give you whiplash.The handle is very comfortable and nice to grasp.Not sure how well this would wash up as the spongy like material I feel might hold dirt and smells.Only thing I wish is the leash was longer, so definitely go for the 8ft one.
SG
Reviewed in Canada on October 13, 2024
As many dog owners know, the leash has to be replaced every so often. We selected this particular item as the color matched our dog's vest (Wife's decision). It is very comfortable in the hand, and having the second short handle really helps when we need her to sit and stay close as she gets a little too excited when someone passes her on the walking paths. This allows us to hold her tight from the leash rather than from her vest which I feel gives her a little more freedom to not feel held down. The material is very good quality and no strings left over or otherwise. The clip is very strong and what I would expect any decent leash to have. The price point makes this a perfect cost effective solution to expensive leashes and I feel it will last for some time. So far we have not seen or experienced any issue with this whatsoever, and when I eventually need a new one, this will be the go to. We are very satisfied and highly recommend for all doggy parents out there. Great value for the cost.
Recommended Products