Shopping Cart

Your cart is empty.

Your cart is empty.

Electric Heat Sequencer Control 24 Volt for Q107 24A34-14 525-37328-000 DGS107, HR8330D1039, 51172-131-5, 33848, NS107, 611-007, 24A34-14, 525-37328-000.

Free shipping on orders over $29.99

$49.91

$ 26 .99 $26.99

In Stock
  • Electric Heat Sequencer Control 24 Volt for Q107 24A34-14 525-37328-000 DGS107, HR8330D1039, 51172-131-5, 33848, NS107, 611-007, 24A34-14, 525-37328-000.
  • Parts Connect Sequencer part number PCQ107. 24 Volts 2 DPST-1 SPST Sequencers 1 Timing / 1 Switch Off 1-160 Seconds On 1-160 Seconds PSQ Models are Direct Replacement for Most Fan / Heat Sequencing Functions. Terminal Markings are Equivalent to Competitive Types. Replacement for Numbers:
  • DGS107, HR8330D1039, 51172-131-5, 33848, NS107, 611-007, Supco Q107, 24A34-14, 525-37328-000. COMBINED LOAD RATING TABLE (ALL MODELS) 30A @ 240 VAC TOTAL, 23A Non-Inductive + 7 FLA / 42 LRA Inductive, ON Time: Elapsed time to make contacts after heater is energized (min. to max.) OFF Time: Elapsed time to break contacts after heater is de-energized (min. to max.) M1-M2 and M3-M4 are always first switches to turn ON and last to turn OFF. All other switches are random ON and random OFF
  • NOTE Underwriters Laboratories requires a fan interlock circuit to insure the blower remains operating whenever more than one sequencer is used. The fan interlock should be the M1/ M2 contacts of the second or third sequencer. All M1/ M2 contacts are wired to the blower motor so that any sequencer that is energized will keep the blower ON. rev92816a Product Details


Electric Heat Sequencer Control 24 Volt for Q107 24A34-14 525-37328-000 DGS107, HR8330D1039, 51172-131-5, 33848, NS107, 611-007, 24A34-14, 525-37328-000. Parts Connect Sequencer part number PCQ107. 24 Volts 2 DPST-1 SPST Sequencers 1 Timing / 1 Switch Off 1-160 Seconds On 1-160 Seconds PSQ Models are Direct Replacement for Most Fan / Heat Sequencing Functions. Terminal Markings are Equivalent to Competitive Types. Replacement for Numbers: DGS107, HR8330D1039, 51172-131-5, 33848, NS107, 611-007, Supco Q107, 24A34-14, 525-37328-000. COMBINED LOAD RATING TABLE (ALL MODELS) 30A @ 240 VAC TOTAL, 23A Non-Inductive + 7 FLA / 42 LRA Inductive, ON Time: Elapsed time to make contacts after heater is energized (min. to max.) OFF Time: Elapsed time to break contacts after heater is de-energized (min. to max.) M1-M2 and M3-M4 are always first switches to turn ON and last to turn OFF. All other switches are random ON and random OFF NOTE Underwriters Laboratories requires a fan interlock circuit to insure the blower remains operating whenever more than one sequencer is used. The fan interlock should be the M1/ M2 contacts of the second or third sequencer. All M1/ M2 contacts are wired to the blower motor so that any sequencer that is energized will keep the blower ON. rev92816a Product Details 


Recommended Products

$979.99

$ 99 .00 $99.00

4.3
Select Option

$139.74

$ 56 .99 $56.99

4.5
Select Option

$599.00

$ 99 .00 $99.00

4.8
Select Option

$2,530.00

$ 99 .00 $99.00

4.9
Select Option

$1,100.18

$ 99 .00 $99.00

4.5
Select Option

$69.49

$ 32 .99 $32.99

4.4
Select Option